St. Elizabeth

Fall 2013 / Lent 2014 / Summer 2014 : 1250 Man/Hours

Demolition of basement areas and removal of unused and stored materials, recycled metal and paper products

Remodeled and provided new racking system for clothing distribution rooms

Cleaned and polished tile floors in distribution rooms

Installed new wood shelving in storage and work room

Painted upper and lower rooms and hallways

Repaired HV intate and exhaust fans in upper and lower floors

Repaired sewer ejection pump

Provided sound control in eating area

Repaired and replaced toilet and sink valves and fixtures

Installed new drinking fountain in lower area

Provided assistance for food distribution and eating area remodeling

Repaired floor scrubbing machine